|
|
|
|
LEADER |
00000cam a22000004i 4500 |
005 |
20221101221638.0 |
008 |
090917s2003 ne a b 001 0 eng d |
010 |
|
|
|a 2003273204
|
011 |
|
|
|a BIB MATCHES WORLDCAT
|
020 |
|
|
|a 9058093549
|
020 |
|
|
|a 9789058093547
|
035 |
|
|
|a (ATU)b11468117
|
035 |
|
|
|a (OCoLC)51963569
|
035 |
|
|
|a (DLC) 2003273204
|
040 |
|
|
|a DLC
|b eng
|e rda
|d ATU
|
042 |
|
|
|a lccopycat
|
050 |
0 |
0 |
|a TH153
|b .A15 2003
|
082 |
0 |
4 |
|a 624.0285
|2 22
|
245 |
0 |
0 |
|a 4D CAD and visualization in construction :
|b developments and applications /
|c [editors] Raja R.A. Issa, Ian Flood, William J. O'Brien.
|
264 |
|
1 |
|a Lisse ;
|a Exton, PA :
|b A.A. Balkema Publishers,
|c [2003]
|
264 |
|
4 |
|c ©2003
|
300 |
|
|
|a viii, 287 pages :
|b illustrations (some colour) ;
|c 25 cm
|
336 |
|
|
|a text
|b txt
|2 rdacontent
|
337 |
|
|
|a unmediated
|b n
|2 rdamedia
|
338 |
|
|
|a volume
|b nc
|2 rdacarrier
|
504 |
|
|
|a Includes bibliographical references and index.
|
505 |
0 |
0 |
|t Benefits of 3D and 4D Models for Facility Managers and AEC Service Providers /
|r Martin Fischer, John Haymaker and Kathleen Liston --
|t Beyond Sphereland: 4D CAD in Construction Communications /
|r Dennis Fukai --
|t Fully Integrated and Automated Project Process (FIAPP) for the Project Manager and Executive /
|r F. H. (Bud) Griffis and Carrie S. Sturts --
|t New Construction Management Practice Based on the Virtual Reality Technology /
|r Jarkko Leinonen, Kalle Kahkonen, Tero Hemio, Arkady Retik and Andrew Layden --
|t 4D CAD and Dynamic Resource Planning for Subcontractors: Case Study and Issues /
|r William J. O'Brien --
|t The Role of 4D Modeling in Trade Sequencing and Production Planning /
|r David Riley --
|t The Link Between Design and Process: Dynamic Process Simulation Models of Construction Activities /
|r E. Sarah Slaughter --
|t Acknowledging Variability and Uncertainty in Product and Process Development /
|r Iris D. Tommelein --
|t Application of 4D CAD in the Construction Workplace /
|r Richard J. Coble, Robert L. Blatter and Indrid Agaj --
|t Virtually Real Construction Components and Process for Design-For-Safety-Process (DFSP) /
|r Steve Rowlinson and Bonaventura H. W. Hadikusumo --
|t The Potential of 4D CAD as a Tool for Construction Management /
|r Robert M. Webb and Theo C. Haupt --
|t Virtual Reality: A Solution to Seamless Technology Integration in the AEC Industry? /
|r Raja R. A. Issa --
|t Construction Management Pull for nD CAD /
|r Peter Barrett --
|t Closure /
|r R. R. A. Issa, I. Flood and W. J. O'Brien.
|
588 |
|
|
|a Machine converted from AACR2 source record.
|
650 |
|
0 |
|a Building
|x Data processing
|9 779648
|
650 |
|
0 |
|a Structural engineering
|x Data processing
|9 779654
|
650 |
|
0 |
|a Buildings
|x Computer-aided design.
|
650 |
|
0 |
|a CAD/CAM systems.
|9 314921
|
700 |
1 |
|
|a Issa, Raja R. A.,
|e editor.
|
700 |
1 |
|
|a Flood, Ian,
|e editor.
|9 1074346
|
700 |
1 |
|
|a O'Brien, William J.
|9 1074347
|
907 |
|
|
|a .b11468117
|b 20-03-18
|c 27-10-15
|
942 |
|
|
|c B
|
945 |
|
|
|a 624.0285 FOU
|g 1
|i A455439B
|j 0
|l cmain
|o -
|p $353.67
|q -
|r -
|s -
|t 0
|u 3
|v 6
|w 1
|x 1
|y .i12942893
|z 29-10-15
|
952 |
|
|
|0 0
|1 0
|4 0
|6 624_028500000000000_FOU
|7 0
|9 325966
|a C
|b C
|c cmain
|d 2015-10-29
|g 353.67
|i i12942893
|l 3
|m 6
|o 624.0285 FOU
|p A455439B
|r 2020-05-29 00:00:00
|s 2020-01-21
|t 1
|v 353.67
|w 2021-10-31
|y B
|
998 |
|
|
|a b
|a c
|b 20-03-18
|c m
|d a
|e -
|f eng
|g ne
|h 0
|
999 |
|
|
|c 1195419
|d 1195419
|