4D CAD and visualization in construction : developments and applications / [editors] Raja R.A. Issa, Ian Flood, William J. O'Brien.

Saved in:
Bibliographic Details
Other Authors: Issa, Raja R. A. (Editor), Flood, Ian (Editor), O'Brien, William J.
Format: Book
Language:English
Published: Lisse ; Exton, PA : A.A. Balkema Publishers, [2003]
Subjects:

MARC

LEADER 00000cam a22000004i 4500
005 20221101221638.0
008 090917s2003 ne a b 001 0 eng d
010 |a  2003273204 
011 |a BIB MATCHES WORLDCAT 
020 |a 9058093549 
020 |a 9789058093547 
035 |a (ATU)b11468117 
035 |a (OCoLC)51963569 
035 |a (DLC) 2003273204 
040 |a DLC  |b eng  |e rda  |d ATU 
042 |a lccopycat 
050 0 0 |a TH153  |b .A15 2003 
082 0 4 |a 624.0285  |2 22 
245 0 0 |a 4D CAD and visualization in construction :  |b developments and applications /  |c [editors] Raja R.A. Issa, Ian Flood, William J. O'Brien. 
264 1 |a Lisse ;  |a Exton, PA :  |b A.A. Balkema Publishers,  |c [2003] 
264 4 |c ©2003 
300 |a viii, 287 pages :  |b illustrations (some colour) ;  |c 25 cm 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
504 |a Includes bibliographical references and index. 
505 0 0 |t Benefits of 3D and 4D Models for Facility Managers and AEC Service Providers /  |r Martin Fischer, John Haymaker and Kathleen Liston --  |t Beyond Sphereland: 4D CAD in Construction Communications /  |r Dennis Fukai --  |t Fully Integrated and Automated Project Process (FIAPP) for the Project Manager and Executive /  |r F. H. (Bud) Griffis and Carrie S. Sturts --  |t New Construction Management Practice Based on the Virtual Reality Technology /  |r Jarkko Leinonen, Kalle Kahkonen, Tero Hemio, Arkady Retik and Andrew Layden --  |t 4D CAD and Dynamic Resource Planning for Subcontractors: Case Study and Issues /  |r William J. O'Brien --  |t The Role of 4D Modeling in Trade Sequencing and Production Planning /  |r David Riley --  |t The Link Between Design and Process: Dynamic Process Simulation Models of Construction Activities /  |r E. Sarah Slaughter --  |t Acknowledging Variability and Uncertainty in Product and Process Development /  |r Iris D. Tommelein --  |t Application of 4D CAD in the Construction Workplace /  |r Richard J. Coble, Robert L. Blatter and Indrid Agaj --  |t Virtually Real Construction Components and Process for Design-For-Safety-Process (DFSP) /  |r Steve Rowlinson and Bonaventura H. W. Hadikusumo --  |t The Potential of 4D CAD as a Tool for Construction Management /  |r Robert M. Webb and Theo C. Haupt --  |t Virtual Reality: A Solution to Seamless Technology Integration in the AEC Industry? /  |r Raja R. A. Issa --  |t Construction Management Pull for nD CAD /  |r Peter Barrett --  |t Closure /  |r R. R. A. Issa, I. Flood and W. J. O'Brien. 
588 |a Machine converted from AACR2 source record. 
650 0 |a Building  |x Data processing  |9 779648 
650 0 |a Structural engineering  |x Data processing  |9 779654 
650 0 |a Buildings  |x Computer-aided design. 
650 0 |a CAD/CAM systems.  |9 314921 
700 1 |a Issa, Raja R. A.,  |e editor. 
700 1 |a Flood, Ian,  |e editor.  |9 1074346 
700 1 |a O'Brien, William J.  |9 1074347 
907 |a .b11468117  |b 20-03-18  |c 27-10-15 
942 |c B 
945 |a 624.0285 FOU  |g 1  |i A455439B  |j 0  |l cmain  |o -  |p $353.67  |q -  |r -  |s -   |t 0  |u 3  |v 6  |w 1  |x 1  |y .i12942893  |z 29-10-15 
952 |0 0  |1 0  |4 0  |6 624_028500000000000_FOU  |7 0  |9 325966  |a C  |b C  |c cmain  |d 2015-10-29  |g 353.67  |i i12942893  |l 3  |m 6  |o 624.0285 FOU  |p A455439B  |r 2020-05-29 00:00:00  |s 2020-01-21  |t 1  |v 353.67  |w 2021-10-31  |y B 
998 |a b  |a c  |b 20-03-18  |c m  |d a   |e -  |f eng  |g ne   |h 0 
999 |c 1195419  |d 1195419 
Availability

City Campus

  • Call Number:
    624.0285 FOU
    Copy
    Available - City Campus Main Collection
Requests
Request this item Request this AUT item so you can pick it up when you're at the library.
Interlibrary Loan With Interlibrary Loan you can request the item from another library. It's a free service.