Construction cost management : learning from case studies / Keith Potts and Nii Ankrah.

I tiakina i:
Ngā taipitopito rārangi puna kōrero
Ngā kaituhi matua: Potts, Keith F. (Author), Ankrah, Nii (Author)
Hōputu: Pukapuka
Reo:English
I whakaputaina: London : Routledge/Taylor & Francis Group, 2013.
Putanga:Second edition
Ngā marau:

MARC

LEADER 00000cam a2200000 i 4500
005 20221102154243.0
007 ta
008 130408s2013 enk b 001 0 eng d
010 |a  2013001416 
011 |a BIB MATCHES WORLDCAT 
020 |a 0415629128  |q hardback  |q alkaline paper 
020 |a 9780415629126  |q hardback  |q alkaline paper 
020 |a 0415629136  |q paperback  |q alkaline paper 
020 |a 9780415629133  |q paperback  |q alkaline paper 
035 |a (ATU)b13504009 
035 |a (OCoLC)781675128 
040 |a DLC  |b eng  |e rda  |c DLC  |d YDX  |d BTCTA  |d OCLCO  |d OCLCF  |d YDXCP  |d UWW  |d ATU 
042 |a pcc 
050 0 0 |a TA682.26  |b .P68 2013 
082 0 0 |a 624.0681  |2 23 
100 1 |a Potts, Keith F.,  |e author.  |9 826268 
245 1 0 |a Construction cost management :  |b learning from case studies /  |c Keith Potts and Nii Ankrah. 
250 |a Second edition 
264 1 |a London :  |b Routledge/Taylor & Francis Group,  |c 2013. 
264 4 |c ©2013 
300 |a xix, 367 pages ;  |c 25 cm 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a "First edition published 2008 by Taylor and Francis"--Title page verso. 
500 |a "Simultaneously published in the USA and Canada"--Title page verso. 
504 |a Includes bibliographical references and index. 
505 0 |a Part 1. Introduction -- Introduction and Overview -- Reports and Recommendations -- Part 2. Management of the Pre-contract Stage -- Selecting the Cosultants and Contractors -- Pre-contract Cost Management -- Cost Management on PFI Projects -- Contractor's Estimating and Tendering -- Part 3. Key Tools and Techniques -- Value Management -- Risk Management -- Whole-life Costing -- Part 4. Procurement Strategies -- Organizational Methods (Part 1) -- Organizational Methods (Part 2) -- Payment Systems and Contract Administration -- Part 5. Management of the Post-contract Stage -- Contractors' Cost Control and Monitoring Procedures -- Change Management : Valuing Variations -- Claims Management -- Part 6. Contracts and Case Studies -- The NEC Engineering and Construction Contract -- FIDIC Standard Forms of International Construction Contract -- Case Study: Heathrow Terminal. 
650 0 |a Construction industry  |x Costs  |9 336060 
650 0 |a Construction industry  |x Cost control  |9 337140 
650 0 |a Construction industry  |x Costs  |v Case studies  |9 641861 
650 0 |a Construction industry  |x Cost control  |v Case studies  |9 641867 
700 1 |a Ankrah, Nii,  |e author.  |9 826271 
907 |a .b13504009  |b 12-08-19  |c 28-10-15 
942 |c B 
945 |a 624.0681 POT  |g 1  |i A549433B  |j 0  |l cmain  |o -  |p $52.93  |q -  |r -  |s -   |t 0  |u 11  |v 11  |w 0  |x 7  |y .i13392700  |z 29-10-15 
952 |0 0  |1 0  |4 0  |6 624_068100000000000_POT  |7 0  |9 363194  |a C  |b C  |c cmain  |d 2015-10-29  |g 52.93  |i i13392700  |l 12  |m 17  |o 624.0681 POT  |p A549433B  |r 2023-04-19 00:00:00  |s 2023-02-09  |t 1  |v 52.93  |w 2021-10-31  |y B 
998 |a b  |a c  |b 06-04-16  |c m  |d a   |e -  |f eng  |g enk  |h 0 
999 |c 1269446  |d 1269446 
Wāteatanga

City Campus

  • Tau karanga:
    624.0681 POT
    Tārua
    Wātea - City Campus Main Collection
Ngā tono
Tāpaetia he tono taumata taitara Tonoa tēnei tūemi AUT kia taea ai te kohi ina tae koe ki te whare pukapuka.
Interlibrary Loan With Interlibrary Loan you can request the item from another library. It's a free service.