Increasing aircraft carrier forward presence : changing the length of the maintenance cycle / Roland J. Yardley [and others].

The U.S. Navy's aircraft carriers allow the nation to deter adversaries, bring airpower to bear against opponents, engage friends and allies, and provide humanitarian assistance. However, these powerful and versatile systems need continuous and regularly scheduled maintenance, and their crews r...

Full description

Saved in:
Bibliographic Details
Main Author: Yardley, Roland J. (Author)
Corporate Authors: United States. Navy, National Defense Research Institute (U.S.)
Format: Ebook
Language:English
Published: Santa Monica, CA : RAND Corp., 2008.
Series:Rand Corporation monograph series.
Subjects:
Online Access:JSTOR Open Access
Table of contents
Description
Summary:The U.S. Navy's aircraft carriers allow the nation to deter adversaries, bring airpower to bear against opponents, engage friends and allies, and provide humanitarian assistance. However, these powerful and versatile systems need continuous and regularly scheduled maintenance, and their crews require a great deal of training to attain and sustain readiness levels. The length of the carrier's training, readiness, deployment, and maintenance cycle, the type of maintenance needed, and the timing of events within the cycle affect the carrier's availability to meet operational needs. Over the past two decades, the proportion of time in a cycle that a carrier spends deployed has decreased, making it difficult for Navy planners to meet the forward-presence requirements of theater commanders. In future years, as the number of carriers in the fleet fluctuates, this challenge will be compounded. In this study, RAND examines the technical feasibility of different cycle lengths and their effect on the forward presence of Nimitz-class aircraft carriers. The authors assess several one- and two-deployment cycles, assuming a deployment length of six months and a time-between-deployments length equal to twice the duration of the previous deployment. The study also presents an analysis of the impact of different cycles on managing shipyard workloads. Among many findings, RAND concludes that shorter cycles can increase the forward presence of the carrier fleet and help level shipyard workloads. However, these shorter cycles will decrease fleet surge readiness. Longer, two-deployment cycles can increase forward presence, but may result in shipyard workload complications and deferred-work backlogs.
Item Description:"Prepared for the United States Navy.".
"MG-706-NAVY"--Page 4 of cover.
Research conducted within the Rand National Defense Research Institute.
Physical Description:1 online resource (xx, 70 pages) : illustrations.
Bibliography:Includes bibliographical references.
ISBN:0833045954
9780833045959
0833044079
9780833044075
Availability
Requests
Request this item Request this AUT item so you can pick it up when you're at the library.
Interlibrary Loan With Interlibrary Loan you can request the item from another library. It's a free service.